Blasting was required to break-up the bed rock in order to excavate the basement, the sewer line, the water line and water storage area. We hid behind the trees to get the pictures during the three blasting events.
Page 3 has photos from the second blasting event for the water storage area and some of the water line. The first couple of pictures are of the machine that was used to bore into the bedrock so the dynomite charges could be placed.