Main Level Framing at the Construction Site

After main level excavation and pouring of the main level foundation and stem walls, the framing of the house began in mid-April, 2009.

Page 10 shows installation of the Great Rooms architectural roof beams. This work was performed in the late July, 2009 timeframe. The last couple of pictures are of the outside of the house as of July 31, 2009 (the most recent picture)