Main Level Framing at the Construction Site

After main level excavation and pouring of the main level foundation and stem walls, the framing of the house began in mid-April, 2009.

Page 11 has pictures of the installed Great Room architectural roof beams plus the design at the top of the tower. This work was performed in the August - September, 2009 timeframe. There are some additional pictures of the first floor framing plus the garage

SLIDESHOW!! Framing Slideshow - All 13 Pages with MUSIC!!

Home
Page 1  Page 2  Page 3  Page 4  Page 5  Page 6  Page 7  
Page 8  Page 9  Page 10  Page 11  Page 12  Page 13


Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Page 1  Page 2  Page 3  Page 4  Page 5  Page 6  Page 7  
Page 8  Page 9  Page 10  Page 11  Page 12  Page 13
Home