Main Level Framing at the Construction Site

After main level excavation and pouring of the main level foundation and stem walls, the framing of the house began in mid-April, 2009.

Page 13 show an exterior 360 degree view of the house (pictures were taken by walking counter clockwise around house). These pictures were taken in the late-September, 2009. At this point, the framing is complete. The next step is plastering the exterior.

SLIDESHOW!! Framing Slideshow - All 13 Pages with MUSIC!!

Home
Page 1  Page 2  Page 3  Page 4  Page 5  Page 6  Page 7  
Page 8  Page 9  Page 10  Page 11  Page 12  Page 13


Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Page 1  Page 2  Page 3  Page 4  Page 5  Page 6  Page 7  
Page 8  Page 9  Page 10  Page 11  Page 12  Page 13
Home