After main level excavation and pouring of the main level foundation and stem walls, the framing of the house began in mid-April, 2009.
Page 8 shows the continue framing the second level plus the start of the garage to the left of the main house. This work was performed in the June, 2009 timeframe
SLIDESHOW!! Framing Slideshow - All 13 Pages with MUSIC!!