Main Level Foundation and Stem Wall Construction

After the basement foundation, floor and walls were completed, the main level foundation and stem wall construction was started.

Page 1 shows the excavation required for the main level foundation. The area that will be covered by the main floor and garage was excavated 4 to 7 feet deep below ground level. This excavation work was required to get the foundation below the freeze line. The area was surveyed, level and compacted

SLIDESHOW!! Main Level Foundation Slideshow - All 7 Pages with MUSIC!!

Home
Page 1  Page 2  Page 3  Page 4  Page 5  Page 6  Page 7


Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Click for Larger Image

Page 1  Page 2  Page 3  Page 4  Page 5  Page 6  Page 7
Home